Compute & networking
GPU platform, rack layout, service clearances, cable paths and the required InfiniBand or Ethernet/RoCEv2 fabric.
SETEK · CRITICAL INFRASTRUCTURE TECHNOLOGIES
Factory-integrated technology for AI, edge and mission-critical operations. Explore the infrastructure behind each platform—from rack power and cooling to monitoring and commissioning.

Explore the IT, power and liquid-cooling architecture behind high-density GPU deployments.
View solution › 02 / EDGEUser-friendly edge deploymentProject-sized compute with coordinated power, environmental monitoring and thermal control.
View solution › 03 / QUANTUMSpecialized quantum supportControlled environments and project-tailored infrastructure around advanced technologies.
View solution › 04 / ENGINEERINGFrom requirement to operationFollow SETEK’s engineering pathway from concept definition to handover.
Open page ›01 / AI PREFABRICATED MODULAR DATA CENTER
SETEK AI PMDC coordinates GPU rack density, direct-to-chip cooling, power distribution, networking and monitoring as one modular infrastructure concept. Its IT, Power and Cooling Modules are planned around the target workload and site interfaces.

BEHIND THE AI PMDC PLATFORM
GPU infrastructure is sized by its complete operating envelope—not only the number of racks. These system layers must be engineered together.
GPU platform, rack layout, service clearances, cable paths and the required InfiniBand or Ethernet/RoCEv2 fabric.
Utility interface, UPS autonomy, battery strategy, branch distribution and rack PDUs matched to peak and sustained loads.
Direct-to-chip cold plates, manifolds and CDU interfaces, with air handling for components not connected to the liquid loop.
Power quality, temperature, humidity, coolant leak alarms, fire detection and controlled maintenance access.
SETEK AI PMDC Model 40: a 10-rack IT-module planning baseline for D2C concepts. Actual layout, density and achievable IT load are confirmed through project engineering.
View the full AI PMDC technical overview ↗Power & cooling sizing calculator ↗02 / EDGE MOBILE DATA CENTER
Bring computing closer to factories, telecom sites and distributed operations. Rack layout, local power continuity, cooling, connectivity and environmental monitoring are coordinated to suit each deployment location.

Representative visualization. Final rack count, cooling arrangement and site installation details are configured per project.
EDGE ENGINEERING PRIORITIES
Available utility supply, footprint, access, network backhaul and external heat rejection.
UPS duration, redundancy and maintenance strategy matched to the required service availability.
Remote status for energy, thermal conditions, access alarms and environmental protection.
03 / QUANTUM INFRASTRUCTURE CONCEPT
Quantum-support infrastructure starts with the selected hardware: dilution refrigeration where applicable, environmental stability, vibration review, electrical distribution and serviceable controls.

Concept visualization. Final equipment layout and performance depend on the selected quantum hardware and engineering requirements.
SETEK / DATA CENTER SEISMIC INFRASTRUCTURE
Three complementary approaches to protecting critical IT infrastructure: rack-level isolation, isolated access flooring, and heavy-duty earthquake-resistant raised flooring.
RACK-LEVEL SEISMIC ISOLATION
Low-profile protection for server racks and heavy IT equipment.

A ball-bearing and engineered-plate mechanism helps reduce earthquake motion transmitted to the supported cabinet. Particularly suitable where rack-level protection is preferred without replacing the entire raised-floor system.
ISOLATED ACCESS FLOOR
Modular floor-level isolation for critical equipment areas.

The modular raised-floor system integrates an engineered isolation mechanism at floor level, allowing critical equipment zones to be configured, expanded, and adapted to existing support layouts.
HEAVY-DUTY SEISMIC-RESISTANT FLOOR
Structural raised-floor support for high equipment loads.

A configurable earthquake-resistant access-floor support system for computer rooms and data centers. It provides structural load support; unlike SP6000 and SP9000N, it is not presented here as a motion-isolation system.
Engineering note: *Published model and design-reference values, not universal allowable working loads. Test evidence, equipment mass, anchorage, clearance, floor design and applicable seismic criteria must be verified for each project.
Explore the seismic engineering guide05 / DEFENSE & MISSION-CRITICAL SYSTEMS
Explore SETEK's wider portfolio for protected edge computing, mobile energy infrastructure, naval electronics and electromagnetic shielding.

Protected edge and communications equipment in a rugged enclosure with vibration isolation and serviceable cooling interfaces tailored to the application.
Request details ↗
Containerized battery energy-storage enclosure concept with protected access, engineered ventilation, thermal management and project-defined fire-safety provisions.
Request details ↗
Transportable mobile data center concept with integrated server racks, a rugged enclosure and power, cooling and connectivity designed around the mission.
Request details ↗
Rugged rack design for naval electronics, combining mechanical resilience and application-specific cable, ventilation and equipment-mounting arrangements.
Technical details ↗
P905EP is an enclosed rack platform for sensitive systems requiring project-defined EMI/EMP shielding, filtration and temperature control.
Technical details ↗Explore the complete Defense portfolio ↗
Final environmental, shock, vibration, shielding and ballistic performance specifications are subject to the selected product configuration and project documentation.
06 / ENGINEERING & SYSTEM INTEGRATION
Our engineering process turns a project's operational requirements into clear decisions on IT layout, electrical capacity, thermal interfaces, site constraints and acceptance criteria.
Rack footprint, equipment density, networking, access and maintainability.
Input supply, distribution, UPS architecture, protection and redundancy.
Coolant distribution, CDUs, residual air cooling and heat rejection.
Start with server configuration, rack power density, operating environment and redundancy objectives. These inputs shape the infrastructure architecture—not the other way around.
Coordinate electrical and thermal boundaries between modules, including supply/return temperatures, flow requirements, cable routes, access zones and external site connections.
Use agreed factory acceptance testing (FAT), transport and installation checks, then site acceptance testing (SAT) to evaluate readiness against defined requirements.
Explore the technical inputs, acceptance gates and system interfaces behind a project-ready design.
View our engineering method ›ABOUT SETEK
SETEK Teknoloji ve Danışmanlık A.Ş. is an Istanbul-based technology and system integration company with established manufacturing relationships in South Korea. Our focus is critical infrastructure, data center systems and engineered protection solutions.
YOUR NEXT INFRASTRUCTURE PROJECT
Tell us what you need. Our team will review the technical scope and respond to your project enquiry.
Share a few details about your project.
Your information is used to respond to your request. Privacy Policy